[{"data":1,"prerenderedAt":401},["ShallowReactive",2],{"\u002Fpcc\u002Ffabric-management-quinquennial-tasks\u002F":3},{"id":4,"title":5,"body":6,"description":393,"extension":394,"meta":395,"navigation":396,"path":397,"seo":398,"stem":399,"__hash__":400},"content\u002Fpcc\u002Ffabric-management-quinquennial-tasks.md","Fabric\u002FQuinquennial Tasks.",{"type":7,"value":8,"toc":386},"minimark",[9],[10,11,12,17,21,24,27,34,42,47,56,66,70,76,279,283,288,345,349,354],"card",{},[13,14,16],"h1",{"id":15},"quinquennial-report-and-fabric-management","Quinquennial Report and Fabric Management",[18,19,20],"p",{},"We conduct our fabric management in response to the Quinquennial Report.",[18,22,23],{},"We tackle this work in \"themes\" rather in the order outlined to be more effective and cost-effective.",[18,25,26],{},"Some of the maintenance tasks listed have separate entries for each year of the Quinquennium.",[18,28,29,30],{},"Work completed is ",[31,32,33],"del",{},"crossed out.",[18,35,36,37,41],{},"We hope to tackle all work labelled ",[38,39,40],"strong",{},"POINTING & STONEWORK"," in one go, if funding applications are successful.",[43,44,46],"h2",{"id":45},"generally","Generally",[48,49,51,52],"div",{"style":50},"text-align: right","\n  ",[18,53,55],{"style":54},"margin:0","\n    (£85,000 - £101,000)\n  ",[57,58,59],"ol",{},[60,61,62,65],"li",{},[38,63,64],{},"A","* Continued maintenance as recommended in appendix 8 of the Report.",[43,67,69],{"id":68},"urgent-immediate-work","URGENT & IMMEDIATE WORK",[48,71,51,72],{"style":50},[18,73,75],{"style":74},"margin-top:0","\n    (£5,000 - £6,000)\n  ",[57,77,79,212,219,227,234,241,248,254,261,269,274],{"start":78},2,[60,80,81,83,84,87,88,118,120,121,201,203,204],{},[38,82,64],{},"* Carry out inspections listed in Schedule 6 and take the action recommended; report findings to Architect with special regard to opening up the suspect areas:",[85,86],"br",{},"MECHANICAL SERVICES",[57,89,90,95,100,105,108,113],{},[60,91,92],{},[31,93,94],{},"Heating System",[60,96,97],{},[31,98,99],{},"Electrics",[60,101,102],{},[31,103,104],{},"Energy Audit with special reference to net zero carbon 2030.",[60,106,107],{},"Lightning Conductor",[60,109,110],{},[31,111,112],{},"Fire Fighting Equipment & Placing",[60,114,115],{},[31,116,117],{},"Bell frame for security (note not used).",[85,119],{},"STRUCTURE",[57,122,123,130,139,146,154,160,165,172,177,182,187,190,195,198],{},[60,124,125,126,129],{},"Monitor settlement cracks noted in the vestries, aisles, porch and clerestories for any further movement. ",[31,127,128],{},"2022 - 2023"," - 2024 - 2025 - 2026",[60,131,132,133,136,137],{},"Monitor tower stonework for any further becoming loose – ensure public safety. ",[31,134,135],{},"2022 - 2023 -"," 2024 - 2025 - 2026 ",[38,138,40],{},[60,140,141,142,136,144],{},"Access & check the condition of the valleys over the nave by the tower, the south transept\u002Forgan & the vestry. ",[31,143,135],{},[38,145,40],{},[60,147,148,149,151,152],{},"Monitor general condition of leadwork and roof slating for defects especially to vestry and north transept. ",[31,150,128],{}," - 2024 - 2025 - 2026 ",[38,153,40],{},[60,155,156,157,159],{},"Monitor for further fungal growth in the nave & north transept\u002Fvestry where the plaster has been removed. ",[31,158,135],{}," 2024 - 2025 - 2026",[60,161,162,163,129],{},"Check security of plaster to south aisle roof. ",[31,164,128],{},[60,166,167,168,151,170],{},"Maintain a check on the west porch roof. ",[31,169,128],{},[38,171,40],{},[60,173,174,175,129],{},"Any closed spaces should be examined for decay when opened up for repair or maintenance especially the roofs. ",[31,176,128],{},[60,178,179,180,129],{},"Monitor boarded floors to nave and, aisles & transepts. ",[31,181,128],{},[60,183,184,185,129],{},"Access & check the glazing to the west & east windows and the clerestories. ",[31,186,128],{},[60,188,189],{},"Carry out a disabled users needs audit.",[60,191,192,193,129],{},"Fire safety check. ",[31,194,128],{},[60,196,197],{},"Carry out a general user safety audit.",[60,199,200],{},"Arboricultural report on the churchyard trees",[85,202],{},"INSURANCE",[57,205,207],{"start":206},15,[60,208,209],{},[31,210,211],{},"Check building insurance cover with E.I.G. via the Diocese.",[60,213,214,216,217],{},[38,215,64],{}," Remove any loose stone on the base of the tower & north aisle for public safety. ",[38,218,40],{},[60,220,221,224,225],{},[38,222,223],{},"B"," Reset eaves gutters to the south aisle, south transept & renew to the north aisle.  ",[38,226,40],{},[60,228,229,231,232],{},[38,230,64],{},"* Clear all debris from roofs, valleys and gutters.  ",[38,233,40],{},[60,235,236,238,239],{},[38,237,64],{},"* Clear all gullies and ensure drains free flowing.  ",[38,240,40],{},[60,242,243,245,246],{},[38,244,64],{}," Check for & secure any further loose gable & clerestory wall flashings.  ",[38,247,40],{},[60,249,250,253],{},[38,251,252],{},"F"," Improve access up in to the tower chambers – for safety.",[60,255,256,258,259],{},[38,257,223],{}," Repair and point the tower & west gable stonework include to renew damaged stonework. And, to the south aisle west and to the north transept east gable.  ",[38,260,40],{},[60,262,263,265,266],{},[38,264,223],{},"* ",[31,267,268],{},"Repair vehicular damage to boundary wall.",[60,270,271,273],{},[38,272,64],{},"* Clear all remaining debris and sundry stored materials from the bell, boiler and organ blower chambers and adjacent.",[60,275,276,278],{},[38,277,252],{},"* Resolve ‘storage’ in the west porch with new fire proof cupboards.",[43,280,282],{"id":281},"within-18-months","WITHIN 18 MONTHS",[48,284,51,285],{"style":50},[18,286,287],{"style":74},"\n    (£50,000 – £55,000)\n  ",[57,289,291,298,305,310,315,320,325,330,335,340],{"start":290},13,[60,292,293,295,296],{},[38,294,223],{}," General stonework repairs, possibly in phases beginning with the tower to be followed with the nave west gable & south aisle.  ",[38,297,40],{},[60,299,300,302,303],{},[38,301,252],{}," Renew the north east vestry valley gutter and lead work complete to improved design and to ease maintenance.  ",[38,304,40],{},[60,306,307,309],{},[38,308,223],{}," Repair areas of defective plasterwork internally, renew where stripped after external repairs.",[60,311,312,314],{},[38,313,223],{}," Renew polycarbonate glazing protection to main windows & doors with ventilated scheme.",[60,316,317,319],{},[38,318,223],{}," Local repairs to marble & mosaic work in the baptistry.",[60,321,322,324],{},[38,323,64],{},"* Secure loose furnishings",[60,326,327,329],{},[38,328,223],{}," General repairs to boundary walls.",[60,331,332,334],{},[38,333,223],{}," Overhaul paths, locally relay.",[60,336,337,339],{},[38,338,64],{},"* Overhaul external doors and repaint.",[60,341,342,344],{},[38,343,252],{}," Implement recommendations of disabled and safety audits.",[43,346,348],{"id":347},"within-quinquennium","WITHIN QUINQUENNIUM",[48,350,51,351],{"style":50},[18,352,353],{"style":74},"\n    (£30,000 – £40,000)\n  ",[57,355,357,364,371,376,381],{"start":356},23,[60,358,359,361,362],{},[38,360,223],{}," Complete the stonework repairs and repointing.  ",[38,363,40],{},[60,365,366,368,369],{},[38,367,223],{}," Reslate the north transept and renew under plastering.  ",[38,370,40],{},[60,372,373,375],{},[38,374,252],{}," Further renewals to glazing and protection.",[60,377,378,380],{},[38,379,223],{}," Redecoration following completion of repairs.",[60,382,383,385],{},[38,384,252],{}," Consider alternative energy source.",{"title":387,"searchDepth":78,"depth":78,"links":388},"",[389,390,391,392],{"id":45,"depth":78,"text":46},{"id":68,"depth":78,"text":69},{"id":281,"depth":78,"text":282},{"id":347,"depth":78,"text":348},"Parish of St. Thomas, Werneth, A Church of England Church in Coppice, Oldham.  Quinquennial Report.  Fabric Management.","md",{},true,"\u002Fpcc\u002Ffabric-management-quinquennial-tasks",{"title":5,"description":393},"pcc\u002Ffabric-management-quinquennial-tasks","l4jtsfpd5wwmg_0qjc5FLQ491O1bSlD11Hzhi1lIOG4",1780753166950]